<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-09-21T16:44:21Z</responseDate><request verb="GetRecord" identifier="oai:repository.unam.edu.na:11070/4031" metadataPrefix="dim">https://repository.unam.edu.na/server/oai/request</request><GetRecord><record><header><identifier>oai:repository.unam.edu.na:11070/4031</identifier><datestamp>2025-08-02T22:01:22Z</datestamp><setSpec>com_11070_3315</setSpec><setSpec>com_11070_3305</setSpec><setSpec>col_11070_2806</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="advisor">Atiku, Sulaiman Olusegun</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="author">Pohamba, Sackeus Tuhafeni</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2025-07-31T08:35:33Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2025-07-31T08:35:33Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2021</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/11070/4031</dim:field>
   <dim:field mdschema="dc" element="description">A research thesis submitted in partial fulfilment of the requirements for the Degree of Master of Business Administration (Public Sector Management)</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract">The purpose of the study was to determine the influence of the performance management system 
on employee productivity at Namibia Training Authority (NTA). The specific study objectives 
were, firstly to investigate the effects of performance planning on employees' productivity; 
secondly to examine the influence of performance appraisal on employees' productivity; thirdly, 
to investigate the relationship between performance feedback and employees' productivity; and 
fourthly, to examine the influence of performance improvement on employees' productivity. A 
descriptive research design, utilising a quantitative approach with regards to the impact of the 
performance management system on employee productivity was adopted for this study. The 
explanatory variables consisted of performance planning, performance appraisal, performance 
feedback and performance improvement and their effects on employee productivity. A sample size 
of 220 participants from a target population of 537 members through random sampling was 
selected and used. A google form questionnaire was utilised to gather data, and with the aid of 
SPSS, results obtained were processed and presented in the form of pie charts, bar graphs and 
tables. Under performance planning, the study revealed that the majority of participants (59%) 
strongly agreed that the inclusion of staff contributes positively to performance as well as that 
planning encourages the commitment and understanding of the set goals and objectives (51% of 
the participants agreed). A few participants (20%) were not sure of whether or not long and short term planning was the best for NT A. With regards to performance appraisal, the study established 
that performance appraisal influences positively individual performance ( 40.5%), performance 
appraisal is valuable to the performance of the organisation (45.9%) and that performance 
appraisal makes employees to work harder than expected (38.2%). Results showed that 
performance feedback and performance improvement positively impacted hugely on employee 
productivity. The regression analysis conducted revealed that all the four independent variables 
had a statistically significant impact on employee productivity (p&lt;0.05) and that they caused a 
93.6% variation on employee productivity. The study concluded that without proper performance 
planning, appraisal, feedback and improvement, chances of high employee productivity were low. 
Recommendations made were that performance planning should involve the staff in order to 
enhance their understanding of their duties. Performance reviews should also be centred on the 
commitl;Ilents of the individual employees to meet the organisational objectives and that 
performance feedback should be fair, unbiased and adequate to all employees</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en</dim:field>
   <dim:field mdschema="dc" element="publisher">University of Namibia</dim:field>
   <dim:field mdschema="dc" element="subject">Performance management</dim:field>
   <dim:field mdschema="dc" element="subject">Employee productivity</dim:field>
   <dim:field mdschema="dc" element="subject">Performance feedback/ appraisal</dim:field>
   <dim:field mdschema="dc" element="subject">Performance planning</dim:field>
   <dim:field mdschema="dc" element="subject">Namibia Training Authority</dim:field>
   <dim:field mdschema="dc" element="subject">University of Namibia</dim:field>
   <dim:field mdschema="dc" element="subject">Namibia</dim:field>
   <dim:field mdschema="dc" element="title">Investigating the influence of the performance management system on employees' productivity at Namibia Training Authority</dim:field>
   <dim:field mdschema="dc" element="type">Thesis</dim:field>open.access</dim:dim></metadata></record></GetRecord></OAI-PMH>